摘要 地下水问题是南水北调中线工程建设遇到的三大关键技术难题之一,研究揭示沿线地下水动态变化规律对保证工程安全具有重要意义。2010年-2012连续3年在丰、枯水期,利用22眼监测井对中线沙河至黄河段沿线分别开展了地下水位监测,并收集整理了沿线40km范围内的11眼国家级地下水位长期监测资料。通过对这些监测数据分析,初步认为中线沙河至黄河段沿线地下水位变化趋势虽然总体上比较平稳,但由于沿线水文地质、工程地质条件复杂(膨胀土渠段、上层滞水分布广泛等),存在较多风险渠段,如遭遇强降雨等外界不利因素,地下水仍可能会对工程安全造成威胁。 Groundwater problem is one of the three major technical problems during the construction of the Middle Route of South-to-North Water Diversion Project, and the dynamic variation of groundwater level along the diversion project is of great significance for ensuring the safety of the project. The groundwater levels in 22 monitoring wells along the section of Sha River to Yellow River of the Middle Route of South-to-North Water Diversion Project were measured during the wet and dry seasons from 2010 to 2012, and the long-term monitoring data of 11 national groundwater observation wells within the scope of 40 km along the section were collected. Based on the analysis of the monitoring data, the variation trend of groundwater level was stable in the section of Sha River to Yellow River of the Middle Route. However, due to the complexity of hydrogeological and engineering geological conditions along the section (Expansive soil drainage and wide distribution of perched water), groundwater is still likely to threaten the safety of project under the unfavorable conditions such as heavy rainfall.
出处 《南水北调与水利科技》 CAS CSCD 北大核心 2013年第6期120-124,共5页 South-to-North Water Transfers and Water Science & Technology
基金 水利部公益性行业科研专项(201201050) 水沙科学与水利水电工程国家重点实验室资助项目(2012-KY-05)
关键词 南水北调 地下水 工程影响 South-to-North Water Diversion Project groundwater engineering impact
  • 相关文献

参考文献5

  • 1南水北调中线一期工程可行性研究总报告[R].武汉:长江水利委员会长江勘测规划设计研究院,2005.
  • 2南水北调中线一期工程初步设计报告[R].武汉:长江勘测规划设计研究有限责任公司,2009.
  • 3中国地质环境监测院.中国地质环境监测地下水位年鉴(2005-2009)[M].北京:中国大地出版社,2009.
  • 4黄定华.普通地质学[M].北京:高等教育出版社,2010:100-101.
  • 5陈立德,陈州丰.南水北调中线大宁河补水工程大昌至茅草坡段工程地质适应性研究[J].南水北调与水利科技,2009,7(5):33-36. 被引量:4

二级参考文献9

共引文献4

同被引文献5

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部