摘要
以某发电厂 12 5MW机组为例 ,通过对湿法脱硫装置安装前后烟囱内的温度及压力分布状况的计算 。
Taking 125 MW unit in one power plant as example,the temperature and pressure distribution of flue gas in stack were analyzed before and after the flue gas wet desulfurization on stack performance was discussed,and some proposals were put forward.
出处
《热力发电》
CAS
北大核心
2000年第6期28-31,共4页
Thermal Power Generation