摘要
针对直流输电额定容量考核试验中交流滤波器的电容器所暴露出的问题,采取铜排连接 、设计专用连接件等措施对电容器连接线进行改进。测试和运行结果表明,改进是成功的。这对今后直流输电系统的建设和运行有一定的借鉴意义。
This paper deals with the problems of capacitor for AC filter which happened in verification tests of Gezhouba-Shanghai HVDC project. The improving measures such as connection with copper busber and special connector has been used. The results of tests and operation show that the improvements are successful and useful for the future HVDC projects.
出处
《中国电力》
CSCD
北大核心
2000年第12期78-80,共3页
Electric Power