摘要
以钟祥市东环路跨湖桥工程项目碗扣脚手架施工为例,对拱桥满堂支架施工时拱架的搭设、不同跨径立杆高度控制、堆载预压试验、支架整体侧移、拆架施工技术及需注意的事项加以介绍和分析,可作为可借鉴的施工经验时参考。
Taking bowl-scaffold construction of arch bridge project in Zhongxiang city as an example, arch build-up in fldl space support construction, pole height control of different span, preloading test, the overall displacement support and removing bracket construction technology and matters needing attention are introduced and analyzed, as can beconstruction experience.
出处
《资源环境与工程》
2013年第1期72-77,86,共7页
Resources Environment & Engineering
关键词
拱桥
满堂支架
整体侧移
arch bridge
full space support
whole lateral displacement