摘要
矿槽控制系统是新建1050 m3高炉工程建设项目之一,主要负责给高炉配料、供料,操作人员按照高炉矿、焦配比设置好配料单,控制系统按控制要求进行正确配料、供料及时间运算实现自动联锁控制皮带上料,将物料及数据传输送至高炉炉顶。
Ore tank control system is one of the new blast furnace project, which mainly responsible for the blast furnace burden, feeding, operating personnel in accordance with the blast furnace, coke ratio set the list of ingredients, control system of the correct ingredients, feeding and time calculation to realize the automatic interlock control belt materials according to the control requirements, the material land the transmission of data is sent to the blast furnace top.