期刊文献+

ZJC2X1040/30/42型综掘超前支护装置在掘进工作面的应用 被引量:1

Application of ZJC2X1040/30/42 Type Mechanized Excavation Device on Forepoling Heading Face
下载PDF
导出
摘要 基于目前掘进工作面前探梁临时支护的局限性,介绍了ZJC2X1040/30/42型综掘超前支护装置在王庄煤矿62B2风巷工作面的应用。实践证明,该超前支护装置操作简单、支护强度高,能够实现全断面主动支撑顶板,性能可靠,安全保障系数高,值得推广应用。 Based on the limitations of probe beam temporary support of on current excavation work, it has introduced ZJC2X1040/30/42 fully mechanized digging forepoling device for 62B2 Wind Tunnel Face in Wangzhuang Coal Mine. Practice has proved that the advance support device is simple to operate, supporting high - intensity, full - face active support to achieve the roof, reliable performance, safety and security factor, should be widely applied.
作者 李旭斌
出处 《煤》 2013年第12期26-27,31,共3页 Coal
关键词 综掘超前支护装置 机械化 安全系数 全面支护 mechanized excavation advance support device mechanization safety factor mechanization comprehensive support
  • 相关文献

同被引文献8

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部