北京地铁车辆检修设备安装工程中设备种类众多,数量较大。设备到货安装工作处于地铁建设的后期,工期紧任务重,给监理工作造成很大困难。本文通过对地铁车辆检修设备的监理质量控制要点、设备安装阶段的控制要点以及资料控制要点进行总结,为地铁车辆检修设备的安装工程监理工作提供一些建议和帮助。
There were a lot of equipments that the species was numerous in the installation engineering of Beijing metro vehicle maintenance equipment.After the equipments arrived,the installation work was down in the late time of metro construction,the tight task was heavy which caused great difficulties to the supervision.This article summarized control points of supervision quality,installation and reading materials to the vehicle maintenance equipment.The paper might provide suggestion to help the supervision for the installation of vehicle maintenance equipment.