摘要
文本以济南市凤凰山桥工程为例,介绍跨河、贝雷梁组合及脚手架支架搭设的技术应用。
This paper takes Ji'nan Fenghuangshan bridge project as an example, introduces the technical application of crossing and Beilei beam combination, and staging scaffold support build-up.
出处
《价值工程》
2013年第34期84-85,共2页
Value Engineering
关键词
贝雷梁
支架搭设
支架预压
Bailei beam
support set up
support prepressing