摘要
介绍昭平水电站砂石料生产、混凝土配合比设计优化、混凝土拌合。
The authors introduced aggregate reclaiming producing,concrete mixing ratio design optimization, concrete mix,transfer and grout systems and quality check and control.They summed concrete construction of the ZHS.
出处
《广西水利水电》
1999年第B12期59-64,共6页
Guangxi Water Resources & Hydropower Engineering