5BRUNNER C. IEC61850 process eonnection:a smart solution to connect the primary equipment to the substation automation system[C]//5th Power Systems Computation Conference. Liege, Belgium : [ s.n. ], 2005 : 1-6.
6IEEE. IEEE1646 Standard communication delivery time performance requirements for electric power substation automation[S]. [ S.l.] : ANSI, 2004.
7IEC. IEC60044-8 Instrument transformers part 8:electronic current transformers[S]. [S.l.]:IEC ,2002.
8IEC. IEC61850-9-1 Communication networks and systems in substations,part 9-1:Specific Communication Service Mapping(SCSM)- sampled values over serial unidirectional muhidrop point to point link[S]. [S.l.]:IEC,2003.
9IEC. IEC61850-9-2 Communication networks and systems in substations,part 9-2 :Specific Communication Service Mapping(SCSM)-sampled values over ISO/IEC8802-3[S]. [S.l.]:IEC,2003.
10IEC. IEC61850 Communication networks and system in substations[S]. [S.l.]:IEE,2005.