Determination of the Scale of Damage in the Wastewater Tunnels Due to Earthquake: A Case Study
Determination of the Scale of Damage in the Wastewater Tunnels Due to Earthquake: A Case Study
参考文献11
-
1O. Ytiziigtillti, G. BirgOren, The behavior of the infrastructure in earthquakes and damages formed, in: Fifth National Conference on Earthquake Engineering, Istanbul, Turkey, May 26-30, 2003.
-
2G.N. Owen, R.E. Scholl, Earthquake Engineering of Large Underground Structures, Report no. FHWA/RD-80/195, U.S. Department of Transportation, Federal Highway Administration and National Science Foundation, 1981.
-
3T. Gaatay, The structural behavior of the wastewater structures under the effect of earthquake and an example study, M.Sc. Thesis, Istanbul University, Institute of Science, Istanbul, 2010.
-
4E.C. Ciiceoglu, The seismic design of the underground structures, M.Sc. Thesis, Institute of Science and Technology, Istanbul, 2006.
-
5C.M. John, T.F. Zahrah, A seismic design of underground structures, Tunnelling and Underground Space Technology 2 (2) (1987) 165-197.
-
60. Yiiztigtillti, K. Uurlu, The seismic performance of the Istanbul's wastewater and water network, in: Earthquake Symposium, Kocaeli, Turkey, Mar. 23-25, 2003, pp. 1376-1383.
-
7Genson Ltd. Co., ISKI Additional Geotechnical report, Report No. 2003/196, IST, 2003.
-
8A. Kahriman, T. ogun, M. Akgtil, Expert's report: 2006-30, Istanbul, 2006.
-
9C. Ozbey, A. San, A. Manuel, M. Erdik, Y. Fahjan, Empirical strong ground motion attenuation relations fornorthwest Turkey, in: Fifth National Conference on Earthquake Engineering, Istanbul, Turkey, May 26-30, 2003.
-
10E. Arlolu, A.O. Ytlmaz, Seismic analysis of the tunnel gallery with solved problems, Technical Thesis, lstanbulBranch of Turkish Chamber of Mining Engineers, 2006.
-
1翟来生.亮马河北路污水隧道盾构掘进段施工初探[J].铁道建筑,2000,40(3):2-4.
-
2林嘉雯.现场装配方案让俄亥俄州隧道工程按时竣工--罗宾斯双护盾硬岩掘进机贯通了关键污水隧道[J].现代隧道技术,2014,51(6):193-193.
-
3卢常亘,乐贵平.亮马河北路污水隧道盾构法施工技术总结[J].市政技术,2001,19(1):47-57. 被引量:1
-
4曹伟飚,蔡岳峰.北京亮马河污水隧道设计[J].地下工程与隧道,2000(2):27-31.
-
5YuXiang Dong.Recent progress of coastal aeolian research in China[J].Research in Cold and Arid Regions,2011,3(6):543-549. 被引量:1
-
6汪挺.加泥式土压平衡盾构的土压管理[J].铁道建筑,2000,40(3):5-8. 被引量:2
-
7渤海溢油康菲中国海油再赔16.83亿[J].国外测井技术,2012(2):76-76.
-
8现场装配方案让俄亥俄州隧道工程按时竣工罗宾斯的双护盾硬岩掘进机贯通了关键污水隧道[J].轨道交通,2014(7):25-25.
-
9英国泰晤士河潮路排水隧道获得规划许可[J].地下工程与隧道,2014,0(4):52-52.
-
10关慧莹.我国海上石油勘探开发溢油事故应急管理研究[J].海洋开发与管理,2015,32(5):107-109. 被引量:3