期刊文献+

基于任务调度优化的小区间中继网络资源分配

Resource Allocation of Inter-cell Relay Network Based on Task Scheduling Optimization
下载PDF
导出
摘要 研究小区间中继网络资源的有效分配问题。中继网络中存在大量的中继节点,通信链路增加,传统的资源调度方法需要更多的从资源有序性方面进行了合理调度,但是没有考虑链路增加,中继节点之间产生的干扰也随之增加,操作资源分配效果下降。为了避免上述缺陷,提出了一种任务调度优化的小区间中继网络资源分配方法。对网络中的通信信号进行去噪处理,去除由于链路增加造成的中继节点干扰,从而为中继网络资源分配提供高质量的网络通信信号。利用重复博弈算法,进行任务调度优化处理,从而完成小区间中继网络资源分配。实验结果表明,利用本文算法进行小区间中继网络资源分配,能够提高资源分配的合理性,提高资源的利用率。 In this paper, the effective resource allocation of inter-cell relay network was researched. We pro-posed a resource allocation method for inter - cell relay network based on task scheduling optimization. In this method, communication signal denoising for network was applied to remove the interference of relay nodes caused by increased links. Thereby, it can provide high - quality signals of network communications to resource allocation of relay network. The using repeated game algorithm for task scheduling optimization can complete the resource allocation of inter - cell relay network. Experimental results show that the use of this algorithm for resource allocation of inter - cell relay network can improve the rational of allocation resources and resource utilization.
作者 王晓雯
出处 《计算机仿真》 CSCD 北大核心 2013年第12期195-198,共4页 Computer Simulation
关键词 任务调度 资源利用率 资源分配 去噪处理 Task scheduling Resource utilization rate resources allocation denoising
  • 相关文献

参考文献9

二级参考文献46

  • 1亓旭光,梁正友.基于蚁群算法的网格资源分配与调度研究[J].广西民族学院学报(自然科学版),2006,12(2):83-86. 被引量:5
  • 2T Stutzle, M Dorigo. A short convergence proof for a class of ant colony optimization algorithms [ J ]. IEEE Transactions on Evolutionary Computation,2002,6(4) :358 -365.
  • 3L M Gambardella, M Dorigo. Solving symmet tic and asymmet2ric TSPs by ant colonies [ C ]. In:Proceedings of the IEEE Conference on Evolutionary Computation, ICEC' 96, IEEE Press, NewYork, 1996. 622 - 627.
  • 4M Dorigo, Di Caro. The ant colony optimization meta - heuristic : New ideas in optimization [ M ]. New York: McGraw - Hill, 1999. 11 - 32.
  • 5Michael Pinedo著,张智海译.调度:原理、算法和系统[M].北京:清华大学出版社,2007.132-138.
  • 6W E Smith. Various optimizes for single - stage production [ J ]. Naval Research Logistics 1956,3:59 -66.
  • 7YANG Wen - hua. Scheduling jobs on a single machine to maximize the total revenue of jobs[ J]. Computer & operations research 36, 2009. 565 - 583.
  • 8CHEN Wen - jinn. Minimizing number of tardy jobs on a single machine subject to periodic maintenance [ J ]. The International Journal of Management Science. Omega 37, 2009. 591 - 599.
  • 9Zhang Changshui, Yan Pingfan. A Genetic Algorithm of Solving Job - Shop Scheduling Problem [ J ]. Chinese Journal of Electron: ics, 1995,4( 1 ) :48 -52.
  • 10Z Michalewicz. Genetic algorithms + data structure = evolution program[ M ]. Berlin, Heidelberg: Springer - Verlag, 1992.

共引文献120

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部