期刊文献+

基于建筑供应链管理的工程采购数量弹性契约研究 被引量:4

Quantity Flexibility Contract Based on Construction Supply Chain Management
下载PDF
导出
摘要 建筑业采用集成式的供应链管理是降低建设工程成本的重要方法。为解决传统工程采购模式存在的合作度低、采购效率低下、对不确定性的应变能力差等缺陷。对比了建筑供应链管理环境下与传统工程采购模式的特点,基于供应链契约理论,构建了承包商与供应商之间的数量弹性采购契约模型,并证明了该契约模式可以有效应对工程采购中需求的不确定性。结论表明,建筑供应链管理下的数量弹性采购契约模式可以使承包商灵活地进行特定的采购活动,进而使建筑供应链上下游企业在一定程度上达到协调。 Adoption of integrated supply chain management is the key to reduce cost in construction industry. Aiming at the disadvantages of low degree cooperation, inefficient purchasing processes, and poor adaptability to demand uncertainty, the traditional purchasing model and the purchasing model under construction supply chain management environment were compared. The quantity flexibility purchasing contract model was set up based on contract theory, which proves that the contract model can effectively cope with demand uncertainty, enable contractor to flexibly carry out certain purchasing activity and further coordinate the construction supply chain.
作者 査京民 黄雷
出处 《工程管理学报》 2013年第6期1-5,共5页 Journal of Engineering Management
关键词 建筑供应链管理 工程采购模式 数量弹性契约 construction supply chain management~ construction purchasing model, quantity flexibility contract
  • 相关文献

参考文献13

  • 1Agapiou A, Flanagan R,Norman G, Notman D. Thechanging role of builders merchants in the constructionsupply chain[J]. Construction Management and Economics,1998, 16 (3 ): 351-361.
  • 2Conlin J. The application of project management softwareand advanced IT techniques in construction delaysinvestigation[J]. International Journal of Project Management,1997, 15 (2): 107-120.
  • 3Anderson S D. Assessment of construction industryproject management practices and performance[R]. Spec.Publ. Austin, Tex: Construction Industry Institute, 1990.
  • 4Kosela. Application of the New Production Philosophy toConstruction^ Tech. Report 72 )[R]. CIFE: Stanford Uni.,CA, 1992.
  • 5O'Brien W J, London K, Vrijhoef R. Construction supplychain modeling-a research review and interdisciplinaryresearch agenda[A]. Proceedings 10th Annual Conference,International Group for Lean Construction. Brazil, 2002.
  • 6Bankvall L,Bygballe L,Dubois A,Jahre M. Interdependencein supply chains and projects in construction[J].Supply Chain Management: An International Journal,2010, 15 (5): 385-393.
  • 7Rothwell S . Polishing up the supply chain[J]. PersonnelManagement, 1992,24 (9): 28-39.
  • 8Dainty A,Briscoe G, Millett S. New perspectives onconstruction supply chain integration[J]. Supply ChainManagement: An International Journal, 2001,6(4):163-173.
  • 9Xianhai M. Assessment framework for constructionsupply chain relationships : Development and evaluation[J]. International Journal of Project Management, 2010,28 (7): 695-707.
  • 10Pasternack B A. Optimal pricing and returns policies forperishable commodities[J]. Marketing Science, 1985,4(2): 166-176.

二级参考文献13

  • 1蔡延东,林少培.一体化供应链下的项目采购管理与供应商管理战略[J].工业工程与管理,2004(S1):100-106. 被引量:5
  • 2储胜,张显东.供应链管理下战略采购的实施框架[J].物流技术,2004,23(11):101-103. 被引量:13
  • 3王要武,薛小龙.供应链管理在建筑业的应用研究[J].土木工程学报,2004,37(9):86-91. 被引量:75
  • 4Saad M, Jones M, James P. A Review of the Progress Towards the Adoption of Supply Chain Management (SCM) Relationships in Construction [J]. European Journal of Purchasing & Supply Chain, 2002 (8): 173 ~ 183
  • 5O' Brien W J, London K, Vrijhoef R Construction Supply Chain Modeling: A Research Review and Interdisciplinary Research Agenda [A] Proceedings 10th Annual Conference International Group for Lean Construction [C]. Brazil, 2002
  • 6Vrijhoef R, Koskela L The Four Roles of Supply Chain Management in Construction [J]. European Journal of Purchasing &Supply Chain, 2000 (6): 169 ~ 178
  • 7Malik M A Khalfan, Chimay J Anumba, Carys E Siemieniuch,Murray A Sinclair. Readiness Assessment of the Constructing Supply Chain for Concurrent Engineering [J]. European Journal of Purchasing & Supply Chain, 2001 (7): 141 ~ 153
  • 8Vrijhoef R, Koskela L, Howell G. Understanding Construction Chains: An Alternative Interpretation [A] . Proceedings 9* Annual Conference International Group for Lean Construction [C] .Singapore, 2001
  • 9Edum - Fotwe F T, Thorpe A, McCaffer R . Information Procurement Practices of Key actors in Construction Supply Chains [J]. European Jourmal of Purchasing & Supply Chain, 2001(7): 155 ~ 164
  • 10Palaneeswaran E, Kumaraaswamy M, Rahman M. Thomas Ng.Curing Congenital Construction Industry Disorders through Relationally Integrated Supply Chains [J] . Building and Environment, 2003 (38): 571 ~582

共引文献86

同被引文献24

引证文献4

二级引证文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部