工程量清单计价下总价包干措施项目的价款调整问题研究 被引量:18

Adjustment of Total Lump Sum Preliminaries under Code of Bills of Quantities and Valuation for Construction Works
下载PDF
导出
摘要 措施项目总价包干是发包人较常采用的一种方式,总价包干方式虽然表面操作简单,但对于承包商而言,是一种风险较高的合同。总价包干的措施项目费调整因素的确定是发承包双方容易产生争议纠纷的焦点。在分析了措施项目性质的基础上,确定研究对象为与工程量有关的措施项目,通过文献分析及实地调研确定总价包干措施项目形式下的合同价款调整因素,梳理出了三大调整因素即工程变更、工程量清单缺项、工程量偏差下引起工程量的变化进而引起总价包干措施项目费的价款调整问题。对目前总价包干措施项目费调整的争议解决提供了建议,能强化《建设工程工程量清单计价规范》(GB50500-2013)在实际应用中的可操作性。 Total lump sum preliminaries are often used by the owner. Although it is operated simply, it is a higher risk contract. Adjustment conditions and adjustment method of total lump sum preliminaries are the focus points of controversy. Based on the analysis of the rationality of preliminaries, the object of the study includes preliminaries which are related to quantities. Through document analysis and field research, adjustment conditions and adjustment method are proposed of variation order, missing item and discrepancy in BQ quantity. The purpose is to show some suggestions for the controversy of the costs of preliminaries.
出处 《工程管理学报》 2013年第6期92-96,共5页 Journal of Engineering Management
基金 国家自然科学基金项目(71172175)
关键词 工程量清单 总价包干措施项目 费用调整 bill of quantities: total lump sum preliminaries: adjustment of cost
  • 相关文献

参考文献10

二级参考文献7

共引文献8

同被引文献74

引证文献18

二级引证文献54

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部