宁波轨道交通1、2号线越江盾构隧道风险分析及施工技术 被引量:4

A Study of Risk Analysis & Construction Technology of Crossriver Shield Tunnel in Ningbo Rail Transit L1 & L2
下载PDF
导出
摘要 宁波市轨道交通1号线江厦桥东站—东门口站区间隧道需穿越奉化江,2号线桃渡路站—鼓楼站区间隧道需穿越余姚江,越江盾构隧道工程环境条件复杂,施工风险大。结合工程实际工况分析宁波轨道交通越江隧道施工风险和难点,并说明实际过程中采取的相应施工技术措施,为宁波类似工程中盾构机顺利完成越江施工提供参考依据。 With the background of Ningbo rail transit engineering, the running tunnel from East Jiangxia Bridge Station to Dongmenkou Station of L1 has to cross Fenghua River and the running tunnel from Taodu Rd. Station to Gulou Station of L2 has to cross Yuyao River. There are complicated engineering conditions and high construction risks in crossriver shield tunnel. Combined with the practical conditions, the relative risks and difficulties are analyzed, and moreover, the relevant adopted technical measures are introduced during the construction period, which may provide references for similar shield machine completing crossriver construction successfully in Ningbo.
作者 陈培新
出处 《中国市政工程》 2013年第6期62-65,69,共5页 China Municipal Engineering
关键词 盾构隧道 水下隧道 风险分析 技术措施 shield tunnel underwater tunnel risk analysis technical measures
  • 相关文献

同被引文献22

引证文献4

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部