4Denis FCioffi. Designing Project Management: a Scientific Notation and an Improved Formalism for Earned Value Calculations [ J]. International Journal of Project Manage-merit, 2006, 24 (2): 136-144.
8Mario Vanhoucke, Stephan Vandevoorde. A simulation and evaluation of earned value metrics to forecast the project duration [ J]. Journal of the Operational Research Society, 2007, 58 (10): 1 361-1 374.