摘要
针对西安绕城高速公路西姜村高架桥工程,紧密结合施工现场环境,通过对制梁场布置、起重设备配置,钻机选型,立柱、盖梁施工方法,钢梁的架设工艺,桥面系关键设备等工程施工技术和方案进行大量的优化和创新,实现了桥梁工程施工快速高效,提高了项目工作的有效性。
To carry out the Xijiangcun, Xi'an city highway viaduct project, combined with the site environment, a large number of optimization and innovation of many construction technologies and schemes, such as beam field layout, hoisting equipment configuration, selection of the drill and columns, capping beam construction method, the steel girder erection process, and key equipment of bridge deck system are used. Consequently, fast and efficient bridge construction is realized and the effectiveness of project work is improved.
出处
《铁道建筑技术》
2013年第11期15-17,28,共4页
Railway Construction Technology
关键词
高架桥
快速施工
方案优化
技术创新
成本控制
viaduct
rapid construction
scheme optimization
technological innovation
cost control