摘要 南水北调中线永定河倒虹吸工程为四孔3.8m×3.8m方涵断面结构。本文对该工程混凝土浇筑模板采用的钢模台车施工形式、施工工艺、施工工序进行了分析,并与常规施工方式进行了对比,总结出了钢模台车施工优势及应用前景。 Four-hole 3.8m × 3.8m square culvert section structure is adopted in South-to-North Water Diversion Midline Yongding River Inverted Siphon Project. The steel mold trolley construction form,construction technology and construction process adopted for concrete pouring template in the project are analyzed in the paper,which are compared with conventional construction methods. Advantages of steel mold trolley construction and application prospects are summed up.
作者 朱凤云
出处 《水利建设与管理》 2013年第11期11-14,共4页 Water Conservancy Construction and Management
关键词 钢模台车衬砌模板 施工效果 分析 steel mold trolley lining template construction effect analysis
  • 相关文献

参考文献2

  • 1马洪琪,周宇,和孙文,等.中国水利水电地下工程施工[M].北京:中国水利水电出版社,2011:226-271,370-453.
  • 2韩增芬,胡玉强.水利工程概预算补充定额[M].郑州:黄河水利出版社,2005:134.

共引文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部