摘要 为全面考核秦山核电650MW发电机性能和技术经济指标,在哈尔滨电机厂有限责 任公司(HEC)总装试验台上,除型式试验外,对其进行了大量的研究试验。本文报道一些重 要 的科学试验成果,它不仅证实了该型发电机温升低、振动小、效率高的特点,而且也证明了 HEC立足于科研开发提高产品质量,满足市场需求的能力。 In order to verify the performance and economical indices of 650MW Qinshan Nucle ar Power generator,except type test,a lot of research works were carried out on HEC test bed.In this paper,very important research results were summed up.It dem onstrated not only 650MW Qinshan nuclear power generator is characteristic of lo w temperature rise,low vibration level,high efficiency,but also HEC has stronger developing capability in line with requirements of market.
作者 沈梁伟
出处 《大电机技术》 北大核心 2000年第6期1-9,共9页 Large Electric Machine and Hydraulic Turbine
关键词 核电站 发电机 总装试验 汽轮发电机组 nucler power generator;running and research test;test bed
  • 相关文献

参考文献2

  • 1QFSN-650-2型汽轮发电机试验报告[R].编号OEA.122.489.
  • 2秦山核电650MW发电机科研试验报告[R].编号OEA.470.166~179.

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部