盖挖法在双岛四线平行换乘地铁车站中的应用 被引量:10

Application of Top-Down Method in Twin-Island Four-Lane Parallel Transition Station
下载PDF
导出
摘要 本文对国内第一座采用盖挖法施工的双岛四线平行换乘地铁车站-国家图书馆站的设计进行了总结,通过对交通的影响、施工难度、工期及管线改移难易程度等方面进行比较,创造性的提出了盖挖逆作法施工国家图书馆站的全新思路。采用增量法对施工进行了全过程模拟,对车站围护结构的受力、变形进行了分析,并且采用大型通用计算程序ANSYS对钢管混凝土梁柱节点进行了分析,结果表明结构是安全可靠的。本文对今后类似工程的实施具有一定的参考意义。 This article summarized the first application of topdown method in twinisland t0urlane parallel tran sition stationthe national library station in Beijing. Through comparing the impact on traffic, construction difficulty, construction period and the difficulty of pipeline alteration of the project, the topdown method is creatively proposed in construction of the National Library Station. To assess the construction safety, the incremental method was em ployed for the whole simulation process of construction ; the stress and deformation of the building envelope of the sta tion were analyzed; and ANSYS, the general finite element software, was used for the analysis of steel tube concrete beamcolumns joints, and the results prove that this structure is safe and reliable. This article is of referential mean ing for future implementation of similar projects.
出处 《地下空间与工程学报》 CSCD 北大核心 2013年第6期1394-1400,共7页 Chinese Journal of Underground Space and Engineering
关键词 双岛四线 换乘车站 盖挖法 增量法 twin-island four-lane transfer station top-down method incremental method
  • 相关文献

参考文献8

二级参考文献12

  • 1孙长胜.地铁黄陂南路车站逆筑法结构设计的特点和创新[J].地下工程与隧道,1994(3):2-9. 被引量:4
  • 2[2]GB 50007-2002,建筑地基基础设计规范[S].
  • 3[2]GB 50299-99,地下铁道工程施工及验收规范[S].
  • 4[3]JGJ 120-99,建筑基坑支护技术规范[S].
  • 5[5]高毓才主编.建设中的北京地铁[M].北京:中国铁道出版社,2002
  • 6[6]哈尔滨市人防办.逆作法施工技术成果报告[Z].
  • 7[7]高辅民,萧岩.盖挖逆作法修建北京人行地下通道试验研究[Z].
  • 8YB9258--97建筑基坑工程技术规范[S].
  • 9GB 50157--2003,地铁设计规范[S].
  • 10铁道专业设计院.北京地铁4号线动物园站结构计算书及施工图文件[z].北京:2005.

共引文献57

同被引文献77

引证文献10

二级引证文献44

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部