期刊文献+

海上浮装关键装置对接过程动力分析 被引量:2

Power Analysis of the Docking Process of Offshore Floatover Key Devices
下载PDF
导出
摘要 进行了上部组块海上浮装对接作业过程中关键装置LMU与DSU的受力分析,明确了上部组块浮装过程对接动力学分析的目的,具体给出了上部组块浮装对接过程中LMU与DSU受力分析的方法以及环境工况的划分方法等。研究结果表明,上部组块浮装对接过程中,LMU垂向受力和DSU横向受力的最大值发生在上部组块重力100%转移至LMU时刻,而LMU横向受力和DSU纵向受力的最大值发生在LMU与插尖刚刚建立接触而载荷开始转移的瞬间。相关方法与结论可为大型结构物海上浮装过程作业提供参考。 The force analysis of the key devices LMU and DSU in the process of topside module floatover docking process was conducted. The purpose of the topside module floatover process docking dynamics was clari- fied. The method for force analysis of LMU and DSU and the method for classification of environmental operating conditions in the process of docking process were given specifically. The research findings show that in the process of docking process, the maximum value of the vertical force of LMU and the lateral force of DSU appears when the 100% weight of topside module transfers to LMU. The maximum value of the lateral force of LMU and the vertical force of DSU emerges at the very moment when LMU has just established the contact with stabbing cone and the load begins to transfer. The relevant method and conclusion can serve as a reference for offshore floatover process operation of large structures.
出处 《石油机械》 北大核心 2013年第12期71-75,共5页 China Petroleum Machinery
基金 中国石油天然气集团公司科学研究与技术开发项目"滩海油气田开发海工新技术研究"(2008B-1305)
关键词 上部组块 浮装 对接作业 动力学分析 topside module floatover docking operation dynamic analysis
  • 相关文献

参考文献6

  • 1Tan B, Haney J A, Leow B, et al. Arthit field devel- opment: Float-over hardware design and issues [ C ]//Offshore Technology Conference, Paper 19300. Houston, Texas: [s. n. ] , 2008.
  • 2Jung J J, Lee W S, Shin H S. Evaluating the impact load on the offshore platform during float-over topside in- stallation [ C ] //Proceedings of the Nineteenth Inter- national Off'shore and Polar Engineering Conference Osa- ka, Japan, June 21 - 26, 2009, OSak: [ s. n. ] , 2009.
  • 3Kocaman A, Kim D J, Ray J. Float-over of arthit PP deck [ C ] //Offshore Technology Conference, Paper 19230. Houston, Texas: [s. n. ] , 2008.
  • 4Wang A M, Jiang Xizhao, Yu Changsheng, et al. Lat- est progress in floatover technologies for offshore instal- lations and decommissioning [ C] //ISOPE2010, June 21-26, 2010, Beijing: [s.n. ], 2010.
  • 5刘东玉,郭刚,徐兴平.海洋平台浮装就位技术研究[J].中国海洋平台,2004,19(6):50-53. 被引量:7
  • 6代福强,关幼耕,畅元江.上部组块海上浮装仿真技术[J].石油机械,2012,40(7):50-54. 被引量:5

二级参考文献8

  • 1刘东玉,郭刚,徐兴平.海洋平台浮装就位技术研究[J].中国海洋平台,2004,19(6):50-53. 被引量:7
  • 2Wang A M,Jiang X Z,Yu C S,et al.Latest progressin floatover technologies for offshore installations and de-commissioning[C]//ISOPE2010,June 21—26,2010,Beijing:[s.n.],2010.
  • 3O'Neil L A,Fakas E,Ronalds B F.History,trendsand evolution of float-over deck installation in open wa-ters[R].SPE 63037,2000.
  • 4Tan B,Haney J A,Leow B,et al.Arthit field develop-ment:float-over hardware design and issues[C]//Off-shore Technology Conference,Paper 19300.Houston,Texas:[s.n.],2008.
  • 5Jung J J,Lee W S,Shin H S.Evaluating the impactload on the offshore platform during float-over topside in-stallation[C]//Proceedings of the Nineteenth Interna-tional Offshore and Polar Engineering Conference Osaka,Japan,June 21—26,2009,Osaka:[s.n.],2009.
  • 6Steven B.Potential failure mechanism in floatover deckmating system[C]//Offshore Technology Conference,Paper 19047.Houston,texas:[s.n.],2007.
  • 7Kocaman A,Kim D J,Ray J.Float-over of arthit PPdeck[C]//Offshore Technology Conference,Paper19230.Houston,Texas:[s.n.],2008.
  • 8刘东玉,关幼耕,畅元江.三种典型桩腿耦合装置虚拟设计[J].中国造船,2010,51(A02):372-377. 被引量:4

共引文献10