期刊文献+

子牙新河入海口区的淤积及冲刷对海管登陆点选择的影响 被引量:1

Effects of sludge and erosion in the estuary of New Ziya River on landing point selection for submarine pipeline
原文传递
导出
摘要 针对天津南港工业区兴建及渤西油气处理厂迁建项目新建海底管道路由及登陆点选择的需要,利用数值模型对大区域(整个渤海)开展水动力数值模拟,进而推求小区域(渤海湾)的边界潮位,对小区域开展水动力数值模拟,同时引入泥沙输运模型,对渤海湾的泥沙运动进行数值模拟,最终获得子牙新河入海口区域行洪条件下泥沙的冲刷、淤积规律。分析得出:海底管道在子牙新河入海口区域登陆是可行性的,但其路由及登陆点应远离冲刷深度大于1 m的区域,基于此提出了两种推荐方案。 In view of the need to choose route and landing points for subsea pipeline of the Tianjin Nangang Industrial Zone, and the relocation project of Boxi Hydrocarbon Processing Plant, numerical model is used to carry out hydrodynamic numerical simulation of the whole region (the whole Bohai Sea) to calculate the tidal boundary of the small region (the Bohai Bay) and make hydrodynamic numerical simulation for the small region. Meanwhile, sediment transport model is introduced to simulate the sediment movement in the Bohai Bay, and finally the erosion and sedimentation pattern of deposits in the estuary area in New Ziya River under the condition of flood discharge are figured out. Analysis in the paper shows that it is feasible for submarine pipeline to land in the estuary area in New Ziya River, but the pipeline route and landing point should be away from the area with a erosion depth of more than 1 m, and on this basis, two recommended solutions are put forward. (1 Table, 3 Figures, 5 References)
出处 《油气储运》 CAS 2013年第12期1316-1319,共4页 Oil & Gas Storage and Transportation
关键词 子牙新河入海口 海底管道 登陆点 泥沙淤积 泥沙冲刷 New Ziya River estuary, subsea pipeline, landing point, sediment deposition, sediment erosion
  • 相关文献

参考文献5

二级参考文献7

共引文献113

同被引文献10

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部