摘要
结合工程实例,对照施工规范,对普通顶管施工的各个关键过程分别加以分析和总结,提出了部分改进建议。
Combined with engineering examples, according to construction standard, the paper analyzes and summarizes the key parts of pipe-jacking construction, and gives some suggestions on improvement.
出处
《价值工程》
2013年第36期110-111,共2页
Value Engineering
关键词
普通顶管
出土
纠偏
技术
应用
ordinary pipe-jacking
be excavated
rectifying
technology
application