期刊文献+

无锡茂业城主塔楼超限高层结构设计 被引量:1

Structural design of out-of-code high-rise building of Maoye City in Wuxi
原文传递
导出
摘要 无锡茂业城主塔楼地下2层,地上69层,大屋面结构高度291.6m,建筑高度304.1m,采用型钢混凝土柱-钢梁-钢筋混凝土内筒结构体系。设置三道加强层,伸臂桁架及腰桁架均采用钢结构,结构体系存在超高、加强层、局部楼板不连续等超限项。工程抗震采用性能化设计方法,根据超限情况,采取相应的计算分析方法及构造加强措施,既满足了抗震安全性要求,又满足建筑功能及结构经济性的要求。 The main tower of Maoye City in Wuxi has two levels of basement and 69 stories above ground. The structural height is 291. 6m and the building height is 304. 1 m. Structural system of steel reinforced concrete column-steel beamreinforced concrete core wall is adopted. Three strengthened stories are set while outriggers and belt truss is steel structure.Out-of-code items existing in structural system include ultra-high,strengthened layers and local floor discontinuity.Performance-based seismic design method was adopted and the corresponding calculating methods and structural strengthening measures were carried out according to out-of-code condition. The above measures as a result fulfill the requirements of seismic safety,architectural function and economy.
出处 《建筑结构》 CSCD 北大核心 2013年第22期49-52,60,共5页 Building Structure
关键词 超限高层建筑 混合结构 加强层 钢支撑 性能化设计 out-of-code high-rise building hybrid structure strengthened story steel brace performance-based design
  • 相关文献

参考文献4

  • 1GB50011-2001.建筑抗震设计规范[S].北京:中国建筑工业出版社.2008:19-24.
  • 2JGJ3-2002高层建筑混凝土结构技术规程[S].北京:中国建筑工业出版社,2002.
  • 3同济大学土木工程防灾国家重点实验室.无锡茂业城主楼刚体模型测压风洞试验机风振响应分析[R].2008.
  • 4建设部建质[2006]220号.超限高层建筑工程抗震设防专项审查技术要点[S]. 2006.

共引文献344

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部