基于IEC61850的MMS通信仿真测试系统的研究与实现 被引量:6

Research and Realization of MMS Communication Simulation Test System Based on the IEC 61850 Standard
下载PDF
导出
摘要 基于IEC 61850标准设计了基于IEC61850 MMS通信的仿真测试系统,实现了IEC 61850服务器通信模块的仿真,对下通过与过程层设备通信实现交流量(SMV)数据的采集和控制量(GOOSE)数据的交互,对上通过IEC 61850服务器通信模块将四遥信息及时向监控后台的上传,同时实时响应监控后台的各种命令,实现了全站各数字化装置的仿真,对智能变电站技术的研究和工程测试联调发挥了重要作用,文中详细介绍了站控层仿真测试系统的设计原理和体系架构,并对各个功能模块的实现进行详细的阐述,对其应用场景和实际使用效果也进行了详实描述。 A communication simulation test system based on IEC 61850 is designed according to the IEC 61850 standard and the module simulation of the IEC 61850 server is realized. This system can collect AC (SMV) data from merging Unit (MU), interact controlling data (GOOSE) with smart terminal Device(STD, upload data information to the IEC 61850 client, and response to the command of the IEC 61850 client. The system has achieved the simulation of each digital device in the digital substation, and played an important role in the technology research and engineering test of the digital substation. This paper describes in detail the design principles and architecture of the communication simulation test system and introduces the detailed application conditions and actual effects of the system.
出处 《电网与清洁能源》 2013年第11期15-19,共5页 Power System and Clean Energy
关键词 IEC 61850 MMS IEC 61850服务器 仿真测试 仿真装置 IEC 61850 manufacturing message specification(MMS) IEC 61850 sever simulation test simulation equipment
  • 相关文献

参考文献4

二级参考文献33

  • 1刘宇恒,陈在,陈浩.太阳能板自动朝阳转向器[J].控制工程,2009,16(S4):49-51. 被引量:4
  • 2殷志良,刘万顺,杨奇逊,秦应力.基于IEC 61850标准的过程总线通信研究与实现[J].中国电机工程学报,2005,25(8):84-89. 被引量:132
  • 3崔岩,蔡炳煌,李大勇,胡宏勋,董静微.太阳能光伏系统MPPT控制算法的对比研究[J].太阳能学报,2006,27(6):535-539. 被引量:177
  • 4王大鹏,栗俊凯,晁军征.浅谈数字化变电站的发展及应用[J].山东电力技术,2007,34(1):14-18. 被引量:20
  • 5[3]C.Hoga and P.Skare.IEC61850 Projects in Germany and Switzerland[C].2005/2006 IEEE PES Transmission and Distribution Conference and Exposition,May 14-21,2006.Dallas,UAS.
  • 6[4]K.P.Brand,T.Maeda,K.Oestrich,P.Rietmann.First Experiences With Customer Specifications of IEC61850 Based Substation Automation Systems[C].Study Committee B5Colloquium,September 14-16,2005.Calgary,Canada.
  • 7[5]Clemens Hoga,Gordon Wong.Utilities and Industries of today:Leading by Following IEC61850[C].15th Power Systems Computation Conference,August 22-26,2005.Liege,Belgium.
  • 8[6]Christoph Brunner.IEC61850 Process Connection-a Smart Solution to Connect the Primary Equipment to the Substation Automation System[C].15th Power Systems Computation Conference,August 22-26,2005.Liege,Belgium.
  • 9[7]K.P.Brand,M.Janssen.The Specification of IEC61850 Based Substation Automation Systems[C].DistribuTECH 2005Conference & Exposition,January 25-27,2005.San Diego,California.
  • 10[8]I.de Mesmaeker,P.Rietmann,K.P.Brand,P.Reinhardt.Substation Automation based on IEC61850[C].Sixth Regional Conference for National Committees of CIGRE in Arab Countries on Arab Common Market for Electricity and Electrical Industries,November 21-23,2005.Cairo,Egypt.

共引文献63

同被引文献23

引证文献6

二级引证文献19

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部