黄骅港三期工程采用了大量筒仓来代替露天堆场。在高机房安装过程中,顺利地解决了施工场地和机房高度过高的问题。文章对黄骅港三期工程的超高机房安装工艺做了详细叙述。
Coal silos are adopted in Huanghua Port Phase III Project instead of open-air storage yard. During the installation of ultra high transfer towers, the difficulties as poor construction sites and high height of transfer towers are successfully solved. This article describes the installation technology of ultra high transfer tower in detail.