具有模具约束的单工序柔性继列型批调度问题研究 被引量:1

Research on a Flexible Single Operation Serial-Batch Scheduling Problem with Model Constraints
下载PDF
导出
摘要 制造系统调度是调度问题研究的热点之一。相对于单件加工的调度问题研究来说,批量加工的调度问题研究较少。然而,批量加工较广泛存在于许多制造系统中,有其很强的工程背景。其中,注塑加工生产即是一种典型的批量加工生产方式。基于注塑加工生产的实际背景,提出了一种具有模具约束的柔性继列型批调度问题。针对此问题中所包含的三方面决策问题,研究了问题的求解框架;提出了启发式规则与遗传算法相结合的混合求解算法;设计了仿真调度案例并进行了仿真调度;通过对调度结果的详细分析,表明了调度结果的合理性和所提出算法的有效性。 Scheduling of manufacturing system is one of the hotspots in scheduling problem researches. Research on batch- scheduling is relatively lesser than that on scheduling with single-part-process production. However, batch processing has strong engineering background for it can be found widely in many kinds of manufacturing systems. For example, injection molding production is a typical batch processing production. Here a kind of flexible single operation serial-batch scheduling problem with model constraints is presented based on the background of injection molding production. With respect to the three decision problems involved in the scheduling problem, a solving framework is proposed firstly. Secondly, a hybrid algorithm combining genetic algorithm and heuristic algorithm is developed. Then, it designed an experimental case and conducted the scheduling simulation. Finally, the results are analyzed in details and can conclude that the solving framework and the hybrid algorithm are effective.
出处 《机械设计与制造》 北大核心 2013年第12期249-252,共4页 Machinery Design & Manufacture
基金 湖北省教育厅科研计划重点资助项目(D20121102)
关键词 批量加工 继列型批调度 模具约束 单工序 注塑生产 Batch Processing Serial-Batch Scheduling Model Constraints Single Operation Injection Molding Pro-duction
  • 相关文献

参考文献16

  • 1C.A.Santos.Batching and sequencing decisions under lead time considerations for single machine problems[D].M.Sc.Thesis,Department of Management Sciences,University of Waterloo,Canada,1984.
  • 2S.Albers,P.Bracker.The complexity of one-machine batching problem[J].discrete applied mathematics,1993,47 (2):87-107.
  • 3P.Brucker M.Y.Kovalyov.Single machine batch scheduling to minimize the weighted number of late jobs[J].Mathematical Methods of Operations Research,1996,43:1-8.
  • 4P.Brucker,M.Y.Kovalyov,Y.M.Shafransky,et al.Batch scheduling with deadlines on parallel machines[J].Annals of Operations Research,1998(83):23-40.
  • 5C.N.Pottsl,V.A.Strusevich,T.Tautenhahn.Scheduling batches with simultaneous job processing for two-machine shop problems[J].Journal of Scheduling,Journal of Scheduling,2001,4(1):25-51.
  • 6J.B.Ghosh.Batch scheduling to minimize total completion time.Operations Research Letters,1994,16(5):271-275.
  • 7J.B.Ghosha,J.N.D.Gupta.Batch scheduling to minimize maximum lateness[J].Operations Research Letters,1997,21(2):77-80.
  • 8E.Ere,J.B.Ghosh.Batch scheduling to minimize the weighted number of tardy jobs[J].Computers & Industrial Engineering,2007,53 (3):394-400.
  • 9S.T.Webster.The complexity of scheduling job families about a common due date[J].Operations Research Letters,1997,20(2):65-74.
  • 10A.J.Mason,E.J.Anderson.Minimizing flow time on a single machine with job classes and setup times[J].Naval Research Logistics (NRL),1991,38(3):333-350.

二级参考文献28

  • 1周亚勤,李蓓智,杨建国.基于遗传算法的批量Flow-shop调度问题研究[J].机械制造,2004,42(10):57-59. 被引量:7
  • 2康一梅,郑应平.Job-shop多机实时调度的并行算法[J].控制与决策,1994,9(2):131-135. 被引量:3
  • 3熊锐,陈浩勋,胡保生.一种生产计划与车间调度的集成模型及其拉氏松弛求解法[J].西安电子科技大学学报,1996,23(4):509-516. 被引量:12
  • 4Fourie P C,Groenwold A A,The particle swarm optimization algorithm in size and shape optimization[J].Structure Multidisciplinary Optimization,2002, 23(4 ) : 259-267
  • 5GAREY E L,JOHNSON D S,SETHI R.The complexity of flowshop and jobshop scheduling[J].Maths Ops.Res.,1976,1:117-129.
  • 6KIM S,BOBROWSKI P.Impact of sequence-dependent setup time on jobshop scheduling performance[J].International Journal of Production Research,1992,32:1 503-1 520.
  • 7AANEN E,GAALMAN C,NAWIJN W.A scheduling approach for a flexible manufacturing system[J].International Journal of Production Research,1993,31:2 369-2 385.
  • 8ZHOU C,EGBELU P J.Scheduling in a manufacturing shop with sequence-dependent setups[J].Robotics and Computer Integrated Manufacturing,1989,5:73-81.
  • 9CHOI I C,KORKMAZ O.Job shop scheduling with separable sequence dependent setups[J].Annals of Operations Research,1997,70:155-170.
  • 10LEE I,SIKORA R,SHAW M J.A genetic algorithm-based approach to flexible flow-line scheduling with variable lot sizes[J].IEEE Transactions on Systems,Man,and Cybernetics-Part B:Cybernetics,1997,27(1):36-53.

共引文献61

同被引文献14

引证文献1

二级引证文献4