摘要
阐述了山西省泽城西安水电站工程趾板混凝土的施工工艺,重点介绍了趾板混凝土的施工方法及冬季趾板混凝土施工质量的保证措施。
The paper narrates the construction technique of toe slab concrete of Zecheng Xi’an Hydroelectric Power Station Project in Shanxi Province,emphatically introduces the construction method of this slab,and the measures to ensure the construction quality in winter construction period.
出处
《山西水利科技》
2013年第3期9-11,共3页
Shanxi Hydrotechnics
关键词
泽城水电站
趾板混凝土
施工质量
Zecheng Hydroelectric Power Station
concrete of toe slab
construction quality