摘要
泽城西安水电站混凝土面板堆石坝是山西省第一座面板堆石坝,通过参照其他工程施工经验,并结合本工程地区的实际情况,制定了合理的施工方案。文中详细叙述了料场开采规划、填筑施工进度、施工顺序及原则、施工方法及施工进度、施工质量及安全施工的保证措施。
The concrete facing rockfill dam of Zecheng Xi’an Hydroelectric Power Station is the first of this dam type in Shanxi Province.Through learning the construction experiences of other projects,and in combination with the local actual condition,the reasonable construction scheme had been carried out.The paper narrates the quarrying planning,the construction schedule of filling embankment,the construction order and principle,the construction method and the measures to guarantee construction schedule,quality and security.
出处
《山西水利科技》
2013年第3期14-17,共4页
Shanxi Hydrotechnics
关键词
混凝土面板堆石坝
填筑
施工
concrete facing rockfill dam
filling
consruction