论述如何处理水利建设地下工程施工中发生的关于地质条件变更引起的各种索赔问题。明确指出发包人、承包人在地质条件变化时合同规定的权力和义务,提出了应在招标前尽量完善各种地质资料,提前标明各种不可预见因素的详细内容,尽量减少不可预见地质变更因素造成的索赔,降低合同双方的风险。
The paper states how to treat various claim problems which occur in the process of constructing underground hydraulic engineering and are brought by the change of geological condition,and clear indicates the right and obligation that are difined in engineering contract under change of geological condition and are possessed and beared by engineering proprietor and contractor,especially,the paper presents that various geological data must be perfected to the full before invitation for bid and the detailed contents of various unforeseen factors must be noted in advance,so as to full decrease the claim that is made by unforeseen geological change factors and to reduce to risk beared by contract couple.