摘要
介绍河曲引黄灌溉工程隧洞施工前准备、洞挖、洞挖支护、隧洞衬砌等隧洞施工阶段的质量控制工作。
The paper introduces the quality control jobs in construction period to construct tunnel for Hequ Yellow River Diversion Irrigation Project, including preparation job before constructing, tunnel excavation, tunnel construction support and construction of concrete lining.
出处
《山西水利科技》
2013年第4期26-27,79,共3页
Shanxi Hydrotechnics
关键词
河曲引黄灌溉工程
隧洞施工
质量控制
Hequ Yellow River Diversion Irrigation Project
tunnel construction
quality control