摘要
以某大桥墩柱纠偏为例,通过现场调查确定了具体的纠偏方案,并从施工前期核实桥梁损坏情况、顶升纠偏施工、纠偏过程监测等方面对施工方法进行了阐述,为类似工程施工积累了经验。
Taking a bridge pier column correction for example, this paper identified the specific correction scheme through field investigation, and elaborated the construction methods from pre-construction to verify bridge damage, jacking correction construction, correction process monito- ring and other aspects, accumulated experience for similar engineering construction.
出处
《山西建筑》
2013年第36期211-213,共3页
Shanxi Architecture
关键词
大桥高墩
压力
偏移
监测
bridge with high pier, pressure, displacement, monitoring