摘要
盾构法隧道纵向沉降问题,包括施工阶段和长期运营中的不均匀沉降问题已日益引起工程界关注,本文对其的产生原因、预防措施及工程对策进行了阐述和讨论。
Shield tunnel's longitudinal settement,including xonstructing period and service period,has been increasing focused on. This paper analyzes the causes and effective measures of shield tunnel's longitudinal settlement.
关键词
盾构法隧道
不均匀沉降
原因
预防措施
纵向沉降
shield tunnel, longitudinal displacement, unequal settlement, reasons, engineering measures