期刊文献+

IF钢铸坯皮下小气泡分布 被引量:6

Distribution of small bubbles at IF continuous casting slab subsurface
原文传递
导出
摘要 通过铸坯取样分析研究了板坯结晶器内拉速和电磁制动与小气泡分布之间的关系,探讨了拉速以及电磁制动对IF钢铸坯皮下气泡大小、数量和分布的影响规律.实验结果表明:铸坯皮下气泡直径小于0.1mm的气泡占总数的57%,0.1—0.5mm之间的占42.5%,大于0.5mm占0.5%,并且随着皮下距离的增加,被捕捉的气泡尺寸越来越小,而气泡数量边部比1/4处要多50%左右,1/4位置最少;拉速提高会导致气泡尺寸变小,在1/4及边部,气泡聚集位置由皮下9mm变为12mm附近,但是低拉速和高拉速均在皮下3mm位置处有气泡聚集;电磁制动下,铸坯中心处气泡尺寸变大,1/4及边部位置气泡尺寸变小,且会使气泡数量总体降低,主要表现在聚集位置处的气泡数量明显减少. The distribution behavior of bubbles in consideration of casting speed and electromagnetic braking in a slab continuous casting mold was investigated by the method of sampling statistics. The effects of electromagnetic braking and casting speed on the size, number and distribution of small bubbles were analyzed in detail. Experimental results show that bubbles with the diameter less than 0.1 mm account for 57%, 0.1-0.5 mm for 42.5%, and bigger than 0.5 mm for 0.5%. The deeper the subcutaneous distance is, the smaller the bubble size is. The number of bubbles in the narrow side is 50% more than that in the 1/4 position, and the number of bubbles in the 1/4 position is the least. With increasing casting speed, the size of bubbles decreases and the position of clusters moves from 9 to 12 mm in the slab subsurface at the 1/4 position and the narrow side, but bubbles gather at 3 mm of subsurface at the low and high casting speeds. When electromagnetic braking is applied, the size of bubbles becomes big in the center, but small in the 1/4 position and the narrow side, and the number of bubbles overall declines, significantly the number of cluster bubbles.
出处 《北京科技大学学报》 EI CAS CSCD 北大核心 2013年第12期1595-1600,共6页 Journal of University of Science and Technology Beijing
关键词 IF钢 连铸 气泡 尺寸分布 IF steel continuous casting bubbles size distribution
  • 相关文献

参考文献5

二级参考文献25

  • 1张炯明,赫冀成,李宝宽.吹入气体对连铸结晶器流体流动的影响[J].金属学报,1995,31(6). 被引量:22
  • 2卢金雄,王文科,张炯明,王新华,王万军,郄芳.板坯连铸结晶器吹氩对铸坯卷渣的影响[J].北京科技大学学报,2006,28(1):34-37. 被引量:19
  • 3蔡开科.连续铸钢[M].冶金工业出版社,1991,9..
  • 4史宸兴.连铸坯质量[M].冶金工业出版社,1980..
  • 5富平原 陈伟庆 等.临钢小方坯连铸中间包结构及铸坯质量的研究[J].临钢科技,1997,(2):56-56.
  • 6Meng X N,Zhu M Y.Thermal Behavior of Hot Copper Plates for Slab Continuous Casting Mold with High Casting Speed[J].ISIJ Int.,2009,49(9):1356-1361.
  • 7Li B K,Okane T,Umeda T.Modeling of Molten Metal Flow in a Continuous Casting Process Considering the Effects of Argon Gas Injection and Static Magnetic-field Application[J].Metall.Mater.Trans.B,2000,31:1491-1503.
  • 8Cukierski K,Thomas B G Flow Control with Local Electromagnetic Braking in Continuous Casting of Steel Slabs[J].Metall.Mater.Trans.B,2008,39:94-107.
  • 9Wang T M,Li J,Du Y Y.Study on Continuous Casting of Cladding Aluminum Alloys with Electromagnetic Brake[J].Materials Research Innovations,2010,14(4):271-276.
  • 10Yu H Q,Wang B F,Li H Q,et al.Influence of Electromagnetic Brake on Flow Field of Liquid Steel in the Slab Continuous Casting Mold[J].J.Mater.Process.Technol.,2008,202:179-187.

共引文献48