3Stanislaw Skoczowski, Stefan Domek, Kreysztof Pietrusewicz, etc. A Method for Improving the Robustness of PID Control [ J 1. IEEE transactions on industrial electronics, vol.52, No.6, 2005 (12).
4Xu P, Valette F, Brissaud F, et al. Technical-economic modelling of integrated water management., wastewater reuse in a French island[J]. Water Science and Technology, 2001, 43 (10):67.
5Chowdhury S, Husain T. Evaluation of drinking water treatment technology: an entropy-based fuzzy application[J]. Journal of Environmental Engineering, 2006, 132(10) : 1264.
6Thawale P, Ghosh T, Singh S, et al. Agro-economic evaluation of water resource project--a modeling approach [ J ]. Environmental Monitoring and Assessment, 2012, 184 ( 4 ) 2575.
7Li X Y, Dai D S, Zhang K. Analysis on fuzzy integrated method of engineering project risk evaluation [ C ]// International Conference on Construction and Real Estate Management. Hong Kong:[s.n.], 2003: 52-55.
8Zbang TF, Yan J, Zhang X, et al. Research on the risk assessment of engineering project based on grey theory and fuzzy mathematics [C]// 4th International Conference on Wireless Communications, Networking and Mobile Computing. Dalian: [s. n. ], 2008,10724-10728.
9刘涛.2010中国污水处理厂名录[M].北京:机械工业出版社,2010.
10Rahman S, Zayed T. Condition assessment of water treatment plant components[J]. Journal of Performance of Constructed Facilities, 2009, 23(4): 276.