普西桥水电站作为阿墨江流域唯一具备年调节功能的最大水电站,采用混凝土面板堆石坝,通过大坝填筑料优化设计,充分利用其余建筑物开挖料,有效降低了工程造价。通过坝体填筑施工实践,摸索出一套行之有效的施工方法及施工工艺。目前大坝已填筑完成80%,正按照明年5月下闸蓄水的目标迈进。
Puxi Bridge Hydropower Station, as the unique largest hydropower station with annual adjustment function in Amo River Basin, adopts concrete face rockfill dam. The excavation materials of other buildings are sufficiently utilized by optimally designing dam filling materials, thereby effectively reducing the engineering cost. A set of feasible construction methods and processes are discovered through dam filling construction practice. Currently, the dam has been filled by 80%, which can be used for accumulating water in May of the next year.
出处
《中国水能及电气化》
2013年第12期1-5,共5页
China Water Power & Electrification
关键词
面板坝
料源规划
碾压试验
填筑施工
face rockfill dam
material source planning
rolling test
filling construction