摘要
三盛公二期水电站根据施工条件不同,采用了导水机构现场装配,内环、外环分体安装的工艺。本文对此加以介绍。
Sanshenggong stage ⅡHydropower Station adopts the processes of assembling water guiding mechanism in the site, and installing the inner ring and outer ring separately according to different construction conditions. The paper introduces the processes.
出处
《中国水能及电气化》
2013年第12期39-42,共4页
China Water Power & Electrification
关键词
三盛公二期水电站
导水机构
整体组装分体安装
Sanshenggong Stage Ⅱ Hydropower Station
water guiding mechanism
overall assembly and separate instal-lation