摘要
前进水库除险加固工程,根据水库溢洪道出口段的特殊情况,制定了溢洪道消能防冲设计方案。本文对其进行了详细介绍。
Spillway energy dissipation and scour prevention design program is formulated according to special condition on reservoir spillway outlet section in Qianjin Reservoir danger removal reinforcement project. The condition is introduced in detail in the paper.
出处
《中国水能及电气化》
2013年第12期57-60,共4页
China Water Power & Electrification
关键词
前进水库
溢洪道
消能防冲
挑流
Qianjin Reservoir
spillway
energy dissipation and scour prevention
deflecting