摘要
LNG液化工厂、煤制气工厂、地下储气库等燃气厂站工程项目具有工艺复杂、设备数量繁杂,大型设备采购周期长、项目参与方众多,工程协调难度大、建设资金需求量大、厂站用途重要,对投产时间有明确要求等特点,传统建设模式易增加建设方风险。本文结合具体燃气EPC工程,分析比较EPC总承包模式与传统建设模式的特点,建议建设方在燃气厂站工程中推行EPC工程总承包建设模式。
Complex process, vast equipment, long term large equipment purchase, lots of project participants, difficult project coordination, large fund quantity, important operation status, definite completion date are the features of gas plant construction such as LNG liquefaction station, coal chemical plant and underground storage station. Traditional construction mode may increase owner' s risks.Through the analysisand comparison between the featuresoftraditionalmodeand EPC mode in context of specific gas EPC construction case,writer suggests owners to practice the EPC mode in gas plant construction for evading risks as possible.
出处
《城市燃气》
2013年第12期28-31,共4页
Urban Gas