摘要
通过对某学院实训楼工程的桩基础质量事故进行分析,并经过方案比选,确定锚杆静压桩的加固补强方案,通过对锚杆静压桩的设计、施工工艺及注意事项进行逐条分析,从而达到实现基础加固补强的效果。
Through the pile foundation quality accident of the college training building engineering, after scheme comparison, the paper puts forward the reinforcement compaction scheme-anchor rod static compression pile. And then, it analyzes the design, construction technology and matters of anchor rod static compression pile, so as to realize the effect of foundation reinforcement compaction.
出处
《山西建筑》
2014年第3期107-108,共2页
Shanxi Architecture
关键词
灌注桩
基础托换
加固补强
锚杆静压桩
bored pile, foundation underpinning, reinforcing compaction, anchor rod static compression pile