摘要
简要介绍了南昌地铁二号线医学院站的工程概况,通过综合比较,选择了合理的施工方法,对于三个方案站位,均采用盖挖法或者部分盖挖法施工技术,同时提出了局部盖挖法的施工方案及临时路面的结构设计方案,以供参考。
A brief introduction on the project of Medical College station of Nanchang metro line 2 has given. As the comprehensive comparison has made, the reasonable construction method is proposed. Cove-excavation or partial method is used in 3 plan station. The structural design for temporary pavement and partial cove-excavation method construction plan is also proposed, so as to reference.
出处
《山西建筑》
2014年第3期198-199,共2页
Shanxi Architecture
关键词
地铁
施工方法
盖挖法
subway, construction method, cove-excavation method