浅谈基础墙、柱竖向钢筋无接头施工控制 被引量:2

Introduction to No Joint Construction Control of Foundation Wall and Column Vertical Reinforcement
下载PDF
导出
摘要 文章通过建筑物基础墙、柱插筋连接的几种传统做法与无接头施工控制在抗震方面的比较,凸显基础墙、柱竖向钢筋无接头施工在节约钢筋材料、缩短工期等方面的效果,彰显其在建筑施工方面的优越性,这不仅是对开展科技创新活动的积极响应和应用,也是展示企业科技创新的窗口。 This paper, through the comparison of traditional method of building foundation walls and pillars reinforced connection and no joint construction control in the earthquake, highlights the effect of no joint construction of foundation walls and column vertical reinforcement in saving steel material and shortening the construction period, reveals its advantages in the construction aspect, it is not only a positive response and application for the science and technology innovation activity, but also is the window to show the enterprises' technological innovation.
作者 吴斌
出处 《价值工程》 2014年第1期90-92,共3页 Value Engineering
关键词 基础墙 柱竖向钢筋连接 无接头施工 抗震结构 foundation walls column vertical reinforcement connection no joint construction the seismic structure
  • 相关文献

参考文献3

  • 1伍丽娟.高强混凝土应用及施工[J].科技信息,2009(25). 被引量:5
  • 2谢利平.钢筋砼剪力墙或柱立筋安装限位装置[P ].中国专利:CN203222999U,2013-10-02.
  • 3谢利平.钢筋砼剪力墙或柱立筋安装限位装置及其安装方法[P ].中国专利:CN 103255924A,2013-08-21.

共引文献4

同被引文献4

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部