摘要
从施工图纸的审查、原材料的检验及施工技术交底等方面入手,介绍了防治变电站水泥混凝土路面裂缝施工准备阶段的控制要点,着重阐述了施工过程中路基、基层、水泥混凝土施工及养护的质量监控措施,以达到最佳的防治效果。
From the inspection of construction draft, the detection of raw materials, and technical disclosure, the paper introduces the controlling points for preventing the crafts on cement-concrete roadbed at its preparation stage, and mainly illustrates the quality inspection and controlling measures for the roadbed, the foundation, the cement-concrete construction and their maintenance, so as to optimize the prevention effect.
出处
《山西建筑》
2014年第1期156-157,共2页
Shanxi Architecture
关键词
变电站
裂缝
路基
防治
substation, crack, roadbed, prevention