摘要
以刚果(布)凯塔公路项目工程为例,对公路工程路基土方施工方法进行了研究,阐述了路堑开挖方法及路堤填筑的施工工序,着重从高程控制,挖方边坡坡度控制、压实度等方面阐述了质量控制措施,以供参考。
Taking the Congo Keita highway project as an example, this paper researched the construction method of highway sub-grade earthwork, elaborated the construction process of cutting excavation and embankment filling, emphatically elaborated the quality control measures from elevation control, excavation volume grade control, compaction degree and other aspects, for reference.
出处
《山西建筑》
2014年第1期164-165,共2页
Shanxi Architecture
关键词
路堑开挖
坡度
控制
压实度
cutting excavation, grade, control, compaction degree