摘要
介绍了哈大客运专线引入沈阳枢纽前后牵引供电情况,在施工阶段牵引供电方案的调整,以及对牵引供电方案进一步探讨。
The paper introduces the power supply conditions of Shenyang railway terminal after leading in Harbin-Dalian passenger dedicated line,the modification of the power supply scheme in stage of its construction,and the further discussion of the traction power supply scheme.
出处
《电气化铁道》
2013年第6期29-30,33,共3页
Electric Railway
关键词
哈大客运专线
沈阳枢纽
牵引供电方案
Harbin-Dalian passenger dedicated line
Shenyang railway terminal
traction power supply scheme