摘要
苏州地铁建设过程中遇到了不同的风险源,根据现场施工情况总结了4种针对不同风险源的处理技术,并探讨了在施工过程中的关键技术和注意事项,对以后类似工程能起到借鉴作用.
Different risky sources appeared in the process of Suzhou subway construction. According to the spot construction situation, four processing techniques for risky sources are summarized, and the key technique and the matters needing special attention in the construction process are presented, which provide references for similar engineering constructions.
出处
《兰州工业学院学报》
2013年第6期68-70,共3页
Journal of Lanzhou Institute of Technology
关键词
风险源
冲桩
拔桩
隔断桩
地层加固
risky source
punching pile
pulling pile
partition piles
ground reinforcement