期刊文献+

龙羊峡水电厂计算机监控系统的运行现状和可行性方案

Running Actuality and Feasibility of Computer Supervising System in LongYangXia Hydropower Plant
下载PDF
导出
摘要 龙羊峡水电厂计算机监控系统结合了近年来我国水电厂计算机监控系统计划、开发、运行的经验 ,考虑到龙羊峡电厂在系统中的重要性 ,根据未来实现现场无人值守 (少人值守 )的要求 ,结合我国国情 ,采用国内外最新技术 ,设备选用了性能较高的硬件设备 ,开放的系统结构 ,具有较长生命力的系统软件配置 ,为提高龙羊峡电厂的经济效益和自动化程度奠定了基础。但在机组自动控制和监控中仍然存在着不少实际运行问题 。 The computer supervising system of LongYangXia Hydropower station combined the planing,designing,running experience of nation’s computer supervising system.Considering Long YangXia Hydropouer plant's essentiality in system,in order to realize the necessitation of nobody on duty,they combined the nation’s situation,adopted new technique,selected and applied hardware equipment of good performance.It has software configure with longer life,it establishes foundation for enhancing economy benefit and automatization degree to LongYangXia Hydropower station,but there have many running problems in autocontrol and supervising on set,the paper puts forth feasibility opinion and implementing scheme.
作者 马小青
出处 《青海电力》 2000年第4期12-15,59,共5页 Qinghai Electric Power
关键词 水电厂 监控系统 计算机 运行 可行性 Supervising System of Set Actuality Feasibility Transform
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部