摘要
结合成绵乐铁路客运专线机场路隧道工程建设实例,通过对隧道工程施工期、地下水环境恢复期及运营期3个不同阶段分析了城市明挖隧道建设对周边地下水环境的影响,并对城市地下工程建设如何减少对水环境影响问题提出了建议。
Taking the Airport Road tunnel construction of Cheng-mian- le railway passenger dedicated line for instance, through analysis of three different stages of the tunnel construction period, groundwater environment recovery period and operational period, impact of the cut and cover tunnel construction for urban transit on the surrounding groundwater environment is discussed, and it puts forward some suggestions on how to reduce the urban underground construction impact on the water environment.
出处
《现代城市轨道交通》
2013年第6期40-43,共4页
Modern Urban Transit
关键词
明挖隧道
隧道建设
地下水
环境影响
cut and cover tunnel, tunnel construction, groundwater,environmental impact