3Bris R,Chatelet E. New Method to Minimize the Preventive Maintenance Cost of Series-parallel Systems [J]. Reliability Engineering & System Safety,2003,82(3):247-255.
4Vaurio J K. Availability and Cost Functions for Periodically Inspected Preventively Maintained Units [J]. Reliab Engng Syst Safety, 1999,63(2) : 133-140.
5Jeffery K C, Horng S M, John W F. A Multipopulation Genetic Algorithm to Solve Multiobjective Scheduling Problems for Parallel Machines[J]. Computers & Operations Research, 2003,30 (7) : 1087-1102.
7Mohammed Sbihi, Christophe Varnier. Single-machineScheduling With Periodic and Flexible PeriodicMaintenance to Minimize Maximum Tardiness[J].Computers & Industrial Engineering,2008,55(4); 830-840.
8Chinyao Low,Chou-Jung Hsu, Chwen-Tzeng Su.Minimizing the make-span with an availability constrainton a single machine under simple linear deterioration[J].Computers & Mathematics with Applications, 2008, 56(1):257-265.