以自贡市城区道路"黑化"工程为例,浅析城市道路加铺的沥青混凝土面层出现大量的早期病害的原因,并针对"黑化"实施过程中的设计、试验、施工等各个环节进行分析,初步总结了一些可能导致或影响早期病害产生的因素。
Taking the urban road'blackening'project of Zigong City as an example, the article analyzes the causes of early faults on the overlaid asphalt concrete surface of urban road, discusses each link of design test and construction in the'blackening'implementation process, and sums up some factors possibly to resul in or influence the cause of early faults.
出处
《城市道桥与防洪》
2013年第11期30-33,13+12,共4页
Urban Roads Bridges & Flood Control
关键词
道路
黑化
早期病害
road
'blackening'early fault